INFRASTRUCTURE


  • Factory Building constructed over an area of 6000 Sq, Ft.
  • Inspection of inward goods as per the quality plan.
  • Dynamic balancing machine for balancing of Rotor with Shaft.
  • Periodically calibrated electrical & mechanical measuring instruments.
  • Finished goods are tested as per the final testing plan.
  • Fully equipped machines are with a team of quality workforce.
  • Vacuum Varnished impregnation machine

Testing Facilities

  • Resistance Measurements
  • Insulation Resistance Test
  • High Voltage Test
  • No Load Test, Load Test
  • Locked Rotor Test
  • Temperature Raise Test